Volkszone Forum banner
21 - 40 of 60 Posts
Joined
·
1,792 Posts
Discussion Starter · #21 ·
Wow what a job so far.

Approx. how many hours do you think you're into it so far, and how many would you expect it to take total?
It's had two weeks work so far, so 80 hours we have not even started on it yet really.

The last one which was this involved took hundreds of hours and is still ongoing.

Gota love the work.:lol::D
 

·
Registered
Joined
·
15,715 Posts
Fantastic work mate:cool:

Hope you and your good lady and little un are fine n dandy :D
 
Joined
·
1,792 Posts
Discussion Starter · #32 ·
Full speed ahead!

Shell flipped the right way up (scary moment that was) and lifted ready for trail fitting.



First line up


More cutting needed, so off comes the nose, front floor, tubs and treasure chest panels.



And they are almost together.

 
Joined
·
1,792 Posts
Discussion Starter · #35 ·
So got a new ramp and stuck this onnit

So with the bus on the ramp it's been up, down, up down etc etc etc lots of lining up and checking.

Bulkhead repaired



Long panel removed, cleaned up and new panel test fitted with the lower A post repaired and the arch test fitted.

 
Joined
·
1,792 Posts
Discussion Starter · #37 ·
Had an Arrrrrrgh moment later on this evening, so the n/s A post was shot and we have a new unit to fit, so we removed the A post



With the A post off we moved to the air box area which again needs to be replaced



So we thought might as well cut the lot out...



And then we (God knows why) looked inside the inner gutter Ooooooooo.....





Why oh why did we look, so time to chop that out...



 
21 - 40 of 60 Posts
Top